Analysis
Cross Border Cost Allocation simulation for the Sajóivánka (HU)- Rimavska Sobotá (SK) and Gabčíkovo (SK)- Gönyű (HU)- Veľký Ďur (SK) 400 kV interconnection PCI projectsUploaded: 26 of April, 2016

The aim of the study is to prepare the cost-benefit analyses of the assessed two projects and to examine whether the projects are eligible for cross-border cost allocation. In the study we demonstrate the CBCA main features, process of it, and we also make a first estimation on cost allocation.