Analysis
Assessment the East Link DC-Power Bridge between Hungary and RomaniaUploaded: 19 of December, 2023

This project aims to analyze a Hungarian-Romanian DC line. In this project, together with E-Bridge, REKK analysed the project's profitability from the investor point of view, but also carried out the social Cost-Benefit Analysis (CBA). The European Power Market Model was used in both tasks, where different scenarios and sensitivities runs were carried out. The used CBA methodology assessment is in line with the ENTSO-E methodology.