Technical support to the Energy Community and its Secretariat to assess the candidate Projects of Energy Community Interest (PECI) and candidate Projects for Mutual Interest (PMI) in electricity, gas and oil infrastructure, and in smart grids development,Analysis

A Consortium of REKK and DNV GL developed a project assessment methodology and evaluated the investment projects submitted as PECI/PMI candidates to the Energy Community in the field of electricity, gas, oil infrastructure and smart grids for the second ...

Gripped by loopsArticle

The simmering discontent of countries suffering from unintended physical flows through their electricity interconnections and within their internal network reached a tipping point for Poland in December 2014. At this time, Polish energy regulator (URE) ...

Modelling assessment of a planned gas interconnector project between Slovenia and HungaryAnalysis

In course of the project more than 50 tariff and infrastructure scenarios were analysed. The main output was: flow on the pipeline, TSO revenues in SI and in HU, social welfare change and social NPV due to the project. The modelling has been carried out ...

Principles of electricity markets 2015BudapestEvent

Liberalisation of the electricity sector has been a very important development worldwide in the past two decades, and is still an ongoing process in many transition countries. This course aims to provide a thorough introduction to the most important ...

Possible reasons for the difference between HUPX and EEX DAM pricesYoung Energy Economists and Engineers Seminar, MadridEvent

The aim of this presentation is to analyse the price convergence between the German (EEX) and the Hungarian (HUPX) power exchanges, in the case of hourly DAM prices. The presentation focuses on the 2011-2013 period, and three hypotheses are established ...

Possible reasons for the difference between HUPX and EEX DAM pricesResearch paper

The aim of this working paper is to analyse the price convergence between the German (EEX) and the Hungarian (HUPX) power exchanges, in the case of hourly DAM prices. The presentation focuses on the 2011-2013 period, and three hypotheses are established ...

The assessment of 10 % interconnection target: security of supply, market integration and CO2 impactsDIW Working Paper 2015Research paper

The aims of the present paper are twofold. First, it analyses the applicability of the 10% interconnection indicator with respect to medium/long term security of supply and market integration: Does it accurately consider the SOS situation of the Member ...

Mysteries of the allocation of transmission capacities of the Slovak-­Hungarian gas interconnector pipelineArticle

The construction of the long-awaited Slovak-Hungarian gas interconnector pipeline is now completed. Although there are still technical issues to resolve, they cannot be blamed for why the commercial operation has not commenced yet. In January 2015, once ...

Principles of electricity markets 2014BudapestEvent

Liberalisation of the electricity sector has been a very important development worldwide in the past two decades, and is still an ongoing process in many transition countries. This course aims to provide a thorough introduction to the most important ...

Principles of electricity markets 2012BudapestEvent

Liberalisation of the electricity sector has been a very important development worldwide in the past two decades, and is still an ongoing process in many transition countries. This course aims to provide a thorough introduction to the most important ...