The study was prepared in support of the Hungarian Energy and Public Utility Regulatory Authority's objective to develop a social cost-benefit analysis methodology for the evaluation of future projects for price regulation purposes and for the ...
Related analyzes
As a follow-up of our past cooperation REKK supported the regulatory authority of Moldova with the implementation of the new natural gas transmission tariff calculation methodology, that is in line with the Tariff Network Code (TAR NC). It applies ...
REKK was commissioned by Eko-svest to perform a series of short analyses regarding the gasification plans in North Macedonia. The questions related to the gasification and residential heating solutions were targeting the following topics: How much does ...
Cost-benefit analyis of natural ga infrastructure with EGMM model and sensitivity analysis. The project was evaluated according to requirements set forth in Regulation 347/2013. evaluation process follows the “2nd ENTSOG methodology for cost-benefit ...
REKK as a member of a major consortium assessed the effects of electrification and alternative fuels in the European building stock on the natural gas transmission networks. The consortium led by Consentec, made up of Fraunhofer ISI, TU Wien, E-think and ...
In the framework of this project, the short and long-term potential of the reduction of Russian gas dependency of the Danube Region as a whole and of individual countries has been analyzed. Draft results have been discussed with experts of international ...
In a previous fact-finding study conducted on natural gas networks and markets in the Western Balkans we found that the WB6 has strong ambitions in gas network development. The rationale for these gas network development infrastructure plans was the ...
The purpose of the project was to support Moldovan authorities in tariff setting for natural gas transmission activity. The task is particularly timely and relevant, as ANRE (the regulator) has already transposed in its Natural Gas Network Code the ...
REKK carried out a market modelling based assessment of gas PCI candidate projects in line with 2nd CBA methodology of ENTSO-G. Net present value and benefit/cost ratio of selected PCI candidate projects were quantified in order to support the Commission ...
The objective of the project was to draft the Natural Gas Transmission Tariff Methodology for Georgia. The development of the new methodology included the establishment of an entry-exit system. The new rules are in line with both the Tariff Network Code ...