Technical assistance for PECI / PMI selection

The Energy Community Secretariat has contracted a consortium of REKK and DNV GL to assist the Energy Community and its Secretariat in the assessment of candidate Projects of Energy Community Interest (PECI) and candidate Projects for Mutual Interest ...

Economic Cost-Benefit Analysis of the Eastring pipeline

REKK performed the socio-economic cost-beneit analysis of the Eastring pipeline project. The analysis was strongly based on our experiences gained at the PECI technical assistance projects and ENTSOG recommendations.

Drafting of the Methodology on Assessing Energy Infrastructure Projects for EaP Countries

The goal of this study was to develop a methodology for assessing gas and electricity transportation infrastructure projects in the Eastern Partnership region. The goal of the project was to arrive to a simplified cost-benefit analysis methodology that ...

Reconstruction of the power supply system of a logistic centre with integration of renewables and on-site combined heat and power production. Feasibility study and project management.

The aim of the study is to prepare a feasibility study for improvement of the energy supply of a Budapest based logistic centre with keeping the security of energy supply of business-critical activities. The study examines the possibility of on-site ...

Market simulation and analyses of the planned Slovenia-Hungary bi-directional gas interconnector

REKK provided a model-based assessment of the planned Slovenian-Hungarian bidirectional gas interconnection pipeline in order to identify the risks of the project and monetize its benefits.In line with the recommendations of ACER and ENTSOG, a ...

Technical support to the Energy Community and its Secretariat to assess the candidate Projects of Energy Community Interest (PECI) and candidate Projects for Mutual Interest (PMI) in electricity, gas and oil infrastructure, and in smart grids development,

A Consortium of REKK and DNV GL developed a project assessment methodology and evaluated the investment projects submitted as PECI/PMI candidates to the Energy Community in the field of electricity, gas, oil infrastructure and smart grids for the second ...

Economic and financial assessment of the transmission network expansion in MontenegroDevelopment of RES

REKK as a member of an international consortium has participated in the Cost Benefit Assessment (CBA) of the network expansion of Montenegro. The assessment included the economic analysis of the new network element: an ENTSO-E compatible CBA assesment ...

Modelling based assessment of gas infrastructure development scenarios

The aim of the project was to investigate the flow impact on the FGSZ infrastrucutre of certain infrastrucutre projects and their combinations. Task 1.: Nord stream (NS2) expansion Task 2.: Nord Stream expansion + Turkish Stream and TESLA ...

Modelling assessment of a planned gas interconnector project between Slovenia and Hungary

In course of the project more than 50 tariff and infrastructure scenarios were analysed. The main output was: flow on the pipeline, TSO revenues in SI and in HU, social welfare change and social NPV due to the project. The modelling has been carried out ...

Cross Border Cost Allocation simulation for the Sajóivánka (HU)- Rimavska Sobotá (SK) and Gabčíkovo (SK)- Gönyű (HU)- Veľký Ďur (SK) 400 kV interconnection PCI projects

The aim of the study is to prepare the cost-benefit analyses of the assessed two projects and to examine whether the projects are eligible for cross-border cost allocation. In the study we demonstrate the CBCA main features, process of it, and we also ...