A strict regulation has been put into force regarding wind power commissioning in Hungary. The technical and safety regulation of electricity installations set the maximum capacity and size of turbines, as well as highest noise level emitted by wind ...
The workshop was organised in kind co-operation with the National Development Ministry and the goal of the conference was to introduce the new Hungarian renewable electricity support scheme and start the dialogue of the regulator and stakeholders. The ...
The current renewable policy period ends in 2020 and the preparation for the post 2020 period is underway, driven by the next EU climate and energy package agreement on a new renewable energy target of at least 27% of final energy consumption in the EU ...
The construction of a series of flood peak reservoirs along the River Tisza was the result of a change in flood defense strategy triggered by the experiences of the Millennium floods and a Hungarian national budget constraint. The Tiszaroff flood ...




