EU Member States are required to update their National Energy and Climate Plans by 30 June 2024. They have to prepare draft NECPs by 30 June 2023. The aim of this work is to perform the necessary background calculations for the NECPs, which we have done ...
The aim of the project is to develop targeted exchanges among selected Hungarian and UK stakeholders including key policy, regulatory, technology platforms/industry bodies, and think tanks. The project will cover challenges where the UK can offer ...
The Forest Carbon Sink Optimization Model (FOX), developed by REKK, is a bio-economic model that integrates biological growth functions with economic decision-making to maximize profits. FOX incorporates the benefits of wood products and introduces the ...
The aim of the study is to examine how the share of natural gas in Hungary's total energy supply with a 34. 1% share (2019, Hungarian energy balance) can be mitigated in the short term (by 2023/24) and in the long term (by 2030). Reducing consumption with ...
During 2021-2022 Europe has witnessed an unprecedented increase in the cost of energy supply, badly impacting most economic sectors, including water and sanitation utilities. WAREG, the European association of water utility regulatory authorities, has ...
Article 4 (8) of Directive (EU) 2018/2001 (RED II) mandates the European Commission (EC) to assess the performance of renewable support schemes granted through competitive tenders. The objective of this study was to assist the EC in reporting to the ...
REKK was involved in Energiaklub's project "Wind energy for Hungary! ", where we analysed the possible effects of new wind capacities in Hungary on the electricity sector. We used our European Power Market Model (EPMM) to quantify the effects of maximum 3 ...
As part of the European Green Deal Fit for 55 package, the European Commission has pro-posed a dedicated emissions trading scheme (ETS2) targeting greenhouse gas emissions from the buildings and transportation sectors. The goal of this study is to ...
REKK as a member of a major consortium assessed the effects of electrification and alternative fuels in the European building stock on the natural gas transmission networks. The consortium led by Consentec, made up of Fraunhofer ISI, TU Wien, E-think and ...
In the framework of this project, the short and long-term potential of the reduction of Russian gas dependency of the Danube Region as a whole and of individual countries has been analyzed. Draft results have been discussed with experts of international ...




